Yesterday, NB131 sailed from the Gdansk Nauta Remontowa Shipyard towards the shipyards in Leirvik and Sogn.

Below we present the scope of works carried out on the site:

1. Outfitting / assembly of hulls
a) assembly of parts of blocks / including revisions – approx. 30 tons;
b) assembly of light components for the refrigeration and freezing system;
c) assembly of tank adapters for anti-healing pipe systems;
d) installation of cable trays and cable trays type FS / Roxtec (steel + aluminum);
e) delivery of heavy components – stern gate, parking cradle.
2. Piping / Piping works – prefabrication and assembly of the following systems:
329 Fish transport
3841 Return Sea Water
4052 Active roll reduction
570 Mechanical ventilation
581 Sanitary
582 Sewage
648 Thermal oil
6482 Heat coil
6483 Heat coil 3rd category
701 FO Overflow
7011 FO Supply & Transfer
702 FO Purification
712 LO Purification
721 SW cooling
7222 FW cooling
801 Ballast including GRE
803 Bilge
8041 Drain
813 Fire deckwash system
817 Water mist
821 Tank ventilation
8213 Tank sounding
880 Cable pipes


3. Accommodation
a) Installation of pins for insulation (steel + aluminum);
b) Assembly of structures for glazing technical rooms.

4. Support in the process:
a) pressure testing of tanks;
b) launching;
c) preparation for towing.